Volume 27 Issue 08
Sep.  2015
Turn off MathJax
Article Contents
Chen Wenjun, Ma Lizhen, Cai Guozhu, et al. Alignment of high energy line for Wuwei Heavy Ion Medical Machine[J]. High Power Laser and Particle Beams, 2015, 27: 085102. doi: 10.11884/HPLPB201527.085102
Citation: Chen Wenjun, Ma Lizhen, Cai Guozhu, et al. Alignment of high energy line for Wuwei Heavy Ion Medical Machine[J]. High Power Laser and Particle Beams, 2015, 27: 085102. doi: 10.11884/HPLPB201527.085102

Alignment of high energy line for Wuwei Heavy Ion Medical Machine

doi: 10.11884/HPLPB201527.085102
  • Received Date: 2015-03-23
  • Rev Recd Date: 2015-05-23
  • Publish Date: 2015-08-11
  • The high energy climbing segment of the Wuwei Heavy Ion Medial Machine has a vertical span of about 18 meters. Due to the suspended installation of oversized and overweighted components, the small installation space and lack of straight sight conditions, the position and angle of the placed magnet is different from the magnet in ground situation, which brings big challenges to the installation alignment. By the aid of a laser tracker and a three-dimensional control network, through multiple coordinate conversion, we explored a new method to eliminate the deviation brought by adjusting the angle of magnet in the climbing segment. This method has effectively improved the efficiency of installation alignment and guaranteed a deviation below 0.10 mm for each finally installed magnet in each dimension. The results are better than the installation precision demands of the Heavy Ion Medical Machine, which provides a strong guarantee for advancing the overall installation process.
  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索
    Article views (1130) PDF downloads(343) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return