Yang Zhigang, Fu Peng, Huang Yiyun, et al. Study and implementation of primary system for ITER pulsed power electrical network[J]. High Power Laser and Particle Beams, 2017, 29: 065009. doi: 10.11884/HPLPB201729.160448
Citation: Yang Zhigang, Fu Peng, Huang Yiyun, et al. Study and implementation of primary system for ITER pulsed power electrical network[J]. High Power Laser and Particle Beams, 2017, 29: 065009. doi: 10.11884/HPLPB201729.160448

Study and implementation of primary system for ITER pulsed power electrical network

doi: 10.11884/HPLPB201729.160448
  • Received Date: 2016-09-06
  • Rev Recd Date: 2017-01-03
  • Publish Date: 2017-06-15
  • The design of the primary system for International Thermo-nuclear Experimental Reactor(ITER) Pulsed Power Electrical Network(PPEN) is introduced. Technical requirements and type selections are described including transformer, circuit breaker, disconnecting switch, instrument transformer, surge arrester, busbar of 400 kV/66 kV/22 kV class. Simulation analysis for PPEN system, which demonstrates that the primary system of PPEN can meet the requirements of ITER operation is done. Finally the progress and work plan for ITER PPEN in china is represented.
  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索
    Article views (1183) PDF downloads(219) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return