Yang Zhigang, Fu Peng, Huang Yiyun, et al. Study and implementation of primary system for ITER pulsed power electrical network[J]. High Power Laser and Particle Beams, 2017, 29: 065009. doi: 10.11884/HPLPB201729.160448
Citation:
Yang Zhigang, Fu Peng, Huang Yiyun, et al. Study and implementation of primary system for ITER pulsed power electrical network[J]. High Power Laser and Particle Beams, 2017, 29: 065009. doi: 10.11884/HPLPB201729.160448
Yang Zhigang, Fu Peng, Huang Yiyun, et al. Study and implementation of primary system for ITER pulsed power electrical network[J]. High Power Laser and Particle Beams, 2017, 29: 065009. doi: 10.11884/HPLPB201729.160448
Citation:
Yang Zhigang, Fu Peng, Huang Yiyun, et al. Study and implementation of primary system for ITER pulsed power electrical network[J]. High Power Laser and Particle Beams, 2017, 29: 065009. doi: 10.11884/HPLPB201729.160448
The design of the primary system for International Thermo-nuclear Experimental Reactor(ITER) Pulsed Power Electrical Network(PPEN) is introduced. Technical requirements and type selections are described including transformer, circuit breaker, disconnecting switch, instrument transformer, surge arrester, busbar of 400 kV/66 kV/22 kV class. Simulation analysis for PPEN system, which demonstrates that the primary system of PPEN can meet the requirements of ITER operation is done. Finally the progress and work plan for ITER PPEN in china is represented.