Citation: | Li Yun, Li Hua, Zhang Lin, et al. Major in-pile performance of CF2 fuel assembly[J]. High Power Laser and Particle Beams, 2020, 32: 106002. doi: 10.11884/HPLPB202032.200159 |
[1] |
李云. 华龙一号核电机组燃料组件研发[J]. 核动力工程, 2019, 40(S1):19-22. (Li Yun. Development of HPR1000 fuel assembly[J]. Nuclear Power Engineering, 2019, 40(S1): 19-22
|
[2] |
焦拥军. “华龙一号”燃料组件设计研究及验证[J]. 中国核电, 2017, 10(4):478-482. (Jiao Yongjun. R&D and validation of HPR1000 fuel assembly[J]. China Nuclear Power, 2017, 10(4): 478-482
|
[3] |
廖鸿宽. 国产自主化燃料组件入堆辐照燃料管理策略研究[J]. 核动力工程, 2016, 37(2):19-22. (Liao Hongkuan. Study of management strategy for in-core irradiated fuel assembly by self-reliance[J]. Nuclear Power Engineering, 2016, 37(2): 19-22
|
[4] |
茹俊. 压水堆燃料组件辐照考验技术研究[J]. 核动力工程, 2017, 38(z1):175-177. (Ru Jun. Technical research on PWR fuel assembly in-pile test[J]. Nuclear Power Engineering, 2017, 38(z1): 175-177
|
[5] |
IAEA. Review of fuel failures in water cooled reactors[R].NF-T-2.1, 2010.
|
[6] |
茹俊. 压水堆燃料组件安全运行保障措施分析[J]. 核动力工程, 2017, 38(6):175-179. (Ru Jun. Analysis of measures for safe operation of PWR fuel assemblies[J]. Nuclear Power Engineering, 2017, 38(6): 175-179
|
[7] |
任亮. 压水堆燃料组件池边检查技术研究进展[J]. 科技导报, 2015, 33(18):91-95. (Ren Liang. Pool side inspection technology for PWR fuel assembly[J]. Science and Technology Review, 2015, 33(18): 91-95
|
[8] |
肖忠. AFA3G燃料组件和燃料棒的辐照生长[J]. 核动力工程, 2002, 23(1):60-62. (Xiao Zhong. Irradiation growth of AFA3G fuel assembly and fuel rod[J]. Nuclear Power Engineering, 2002, 23(1): 60-62
|
[9] |
李伟才. 压水堆燃料组件弯曲变形机理及规避措施[J]. 核动力工程, 2008, 29(2):55-57. (Li Weicai. Mechanism of fuel assembly bowing in PWR and preventive measures[J]. Nuclear Power Engineering, 2008, 29(2): 55-57
|
[10] |
Kyu-Tae K I M. In-reactor performance of an advanced PWR fuel PLUS7 for OPR1000s in Korea[J]. Journal of Nuclear Science and Technology, 2008, 45(8): 836-849. doi: 10.1080/18811248.2008.9711485
|