Volume 18 Issue 07
Jul.  2006
Turn off MathJax
Article Contents
yu cheng-hao, yin li-xin, du han-wen, et al. Survey and alignment design of Shanghai synchrotron radiation facility[J]. High Power Laser and Particle Beams, 2006, 18.
Citation: yu cheng-hao, yin li-xin, du han-wen, et al. Survey and alignment design of Shanghai synchrotron radiation facility[J]. High Power Laser and Particle Beams, 2006, 18.

Survey and alignment design of Shanghai synchrotron radiation facility

  • Publish Date: 2006-07-15
  • The biggest challenge of survey and alignment is the soft groundwork and the tight positioning requirement for Shanghai Synchrotron Radiation Facility. Control network, fiducialization, pre-alignment and installation on site and smoothing are five crucial steps for the installation and alignment process. By utilizing the laser tracker and hydrostatic levelling system, the error budget should be within 0.08 mm for control network and 0.05 mm for the other steps. The expected error budget is 0.12 mm for elements between girders, which is a little smaller than the requirement of 0.15 mm. Besides the target of error control, reliability, efficiency, cost and real-time monitoring are factors considered in the design.
  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索
    Article views (2540) PDF downloads(692) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return